
Monumental Plane Tree Cabling
Dynamic cabling system for the conservation of a historic plane tree in Spoleto.
Installation of a dynamic cabling system on a monumental plane tree approximately 150 years old in the centre of Spoleto. The tree, of considerable historical and landscape value, had a main fork at about 4 metres height with an included bark union, posing a serious risk of structural failure. Following a thorough stability assessment using the VTA method and instrumental analysis, we installed a system of dynamic cables in the upper crown to reduce the load on the critical fork and limit oscillations during strong winds. The intervention preserved this magnificent historic specimen without altering its appearance, while ensuring the safety of the public area below.
Projects

Century-Old Cedar Pruning
Perugia Centro
Maintenance pruning on an 80-year-old Lebanese cedar in the heart of Perugia.
Read more
Controlled Poplar Felling
Corciano (PG)
Progressive dismantling of a 25-metre poplar between two houses in Corciano.
Read more
Historic Building Gutter Cleaning
Assisi (PG)
Gutter cleaning and roof inspection on a historic building in the centre of Assisi.
Read more